Home EV Charger Installation: Costs, Grants and the Rules (2026)

The Planning Portal puts the cost of installing a home EV charger at around £450 for a basic model, rising to about £1,200 for more powerful ones. A government grant of up to £500 is available to renters and flat owners with off-street parking until 31 March 2027, and every installation needs building regulations approval, which a registered electrician can self-certify.

What it costs

The cost depends on the make and model you choose, according to the Planning Portal, which cites research putting installation at between £450 for a basic model and around £1,200 as power and features increase. Higher-powered chargers generally cost more. Ask each installer whether their price includes any upgrade work your existing wiring or fuse box needs.

Grants: who can get one

The government's chargepoint grant for renters and flat owners covers 75% of the cost of buying and installing a charger, up to £500, according to GOV.UK. You must own and live in a flat, or rent a home, and have your own private off-street parking space, plus own or use an eligible electric vehicle. You can't claim if you own and live in a house, unless it has been converted into flats. Separate grants of up to £500 cover households that only have on-street parking and install a cross-pavement solution, and landlords. GOV.UK says the schemes have been extended for a final year, until 31 March 2027.

Choosing a charger

The Planning Portal says 7kW is the most common home charger, charging roughly twice as fast as a normal three-pin plug, while 3.6kW suits low mileage. A 22kW charger needs a three-phase supply, which is very uncommon in UK homes, and many cars can't charge that fast anyway. It doesn't recommend charging from a three-pin socket, because of the risk of overheating and the slow speed: a full charge can take over 30 hours. Since 30 June 2022, chargers sold for home use must have smart functions, pre-set off-peak default charging hours you can change, and a randomised delay, according to GOV.UK.

Do you need planning permission?

Usually not. New permitted development rules for EV chargers came into force on 21 October 2026, and the previous rules can still be used until 20 October 2027, according to the Planning Portal. Under the new rules, a wall-mounted charger at a house is permitted development if its casing is no bigger than 0.2 cubic metres, it is no more than 1.6 metres above the ground, it is the only one, and the property isn't listed or in a conservation area. If the wall faces a road, it mustn't stick out more than 0.2 metres or be within 1.5 metres of the carriageway. Check that your council hasn't removed these rights with an Article 4 direction; otherwise you'll need planning permission.

Building regulations

Building regulations approval is required in all cases, according to the Planning Portal: either the installer is registered with a competent person scheme and self-certifies the work, or building control must be notified. Installing a new circuit is notifiable work under Part P, so a registered electrician should give you an Electrical Installation Certificate and a Building Regulations Compliance Certificate when the job is done.

Charging from the street

Don't trail a charging cable across the pavement. The Planning Portal warns it breaches the Highways Act 1980 and could leave you liable for any injuries it causes. If you only have on-street parking, the cable must cross the footway through an authorised cross-pavement solution, such as a channel set into the pavement, installed by or with permission from the highway authority, usually your council.

Frequently Asked Questions

Can I get an EV charger grant if I own my house?

Not usually. GOV.UK's grant for renters and flat owners excludes people who own and live in a house, unless the house has been converted into flats and you live in one of them.

Do I need planning permission for a home EV charger?

Usually not, as most home chargers are permitted development. You will need permission if your home is listed or in a conservation area, if you want more than one charger, or if it exceeds the size and height limits.

Does installing an EV charger need building regulations approval?

Yes, in every case. A registered electrician can self-certify it; otherwise building control must be notified. You should receive an Electrical Installation Certificate and a Building Regulations Compliance Certificate.

What size home charger do I need?

The Planning Portal says 7kW is the most common. 22kW chargers need a three-phase supply, which very few homes have, and many cars can't use the extra speed.

Where this information comes from

General information only, not legal or financial advice. Last checked 2026-10-22.

Ready to compare electricians?

See the electrician shortlist

More Electrician Guides